Overblog
Edit post Follow this blog Administration + Create my blog
dionysus

ISTQB Foundation Question and Answer No.12

May 11 2019 , Written by Harry Published on #TESTER

ISTQB Foundation Question and Answer No.12

Question

1. ___________ Testing will be performed by the people at client own locations (1M)

A. Alpha testing

B. Field testing

C. Performance testing

D. System testing

2. System testing should investigate (2M)

A. Non-functional requirements only not Functional requirements

B. Functional requirements only not non-functional requirements

C. Non-functional requirements and Functional requirements

D. Non-functional requirements or Functional requirements

3. Which is the non-functional testing (1M)

A. Performance testing

B. Unit testing

C. Regression testing

D. Sanity testing

4. Who is responsible for document all the issues, problems and open point that were identified during the review meeting (2M)

A. Moderator

B. Scribe

C. Reviewers

D. Author

5. What is the main purpose of Informal review (2M)

A. Inexpensive way to get some benefit

B. Find defects

C. Learning, gaining understanding, effect finding

D. Discuss, make decisions, solve technical problems

6. Purpose of test design technique is (1M)

A. Identifying test conditions only, not Identifying test cases

B. Not Identifying test conditions, Identifying test cases only

C. Identifying test conditions and Identifying test cases

D. Identifying test conditions or Identifying test cases

7. ___________ technique can be used to achieve input and output coverage (1M)

A. Boundary value analysis

B. Equivalence partitioning

C. Decision table testing

D. State transition testing

8. Use cases can be performed to test (2M)

A. Performance testing

B. Unit testing

C. Business scenarios

D. Static testing

9. ________________ testing is performed at the developing organization’s site (1M)

A. Unit testing

B. Regression testing

C. Alpha testing

D. Integration testing

10. The purpose of exit criteria is (2M)

A. Define when to stop testing

B. End of test level

C. When a set of tests has achieved a specific precondition

D. All of the above

11. Which is not the project risks (2M)

A. Supplier issues

B. Organization factors

C. Technical issues

D. Error-prone software delivered

12. Poor software characteristics are (3M)

A. Only Project risks

B. Only Product risks

C. Project risks and Product risks

D. Project risks or Product risks

13. ________ and ________ are used within individual workbenches to produce the right output products. (2M)

A. Tools and techniques

B. Procedures and standards

C. Processes and walkthroughs

D. Reviews and update

14. The software engineer's role in tool selection is (3M)

A. To identify, evaluate, and rank tools, and recommend tools to management

B. To determine what kind of tool is needed, then find it and buy it

C. To initiate the tool search and present a case to management

D. To identify, evaluate and select the tools

15. A _____ is the step-by-step method followed to ensure that standards are met (2M)

A. SDLC

B. Project Plan

C. Policy

D. Procedure

16. Which of the following is the standard for the Software product quality (1M)

A. ISO 1926

B. ISO 829

C. ISO 1012

D. ISO 1028

17. Which is not the testing objectives (1M)

A. Finding defects

B. Gaining confidence about the level of quality and providing information

C. Preventing defects.

D. Debugging defects

18. Bug life cycle (1M)

A. Open, Assigned, Fixed, Closed

B. Open, Fixed, Assigned, Closed

C. Assigned, Open, Closed, Fixed

D. Assigned, Open, Fixed, Closed

19. Which is not the software characteristics (1M)

A. Reliability

B. Usability

C. Scalability

D. Maintainability

20. Which is not a testing principle (2M)

A. Early testing

B. Defect clustering

C. Pesticide Paradox

D. Exhaustive testing

Answer

1 B 2 C 3 A 4 B 5 A 6 C 7 B 8 C 9 C 10 D

11 D 12 B 13 B 14 A 15 D 16 A 17 D 18 A 19 C 20 D

Share this post
To be informed of the latest articles, subscribe:
Comment on this post