ISTQB Foundation Question and Answer No.18

May 12 2019 , Written by Harry Published on #TESTER

ISTQB Foundation Question and Answer No.18

Question

1. A Project risk includes which of the following :

a) Organizational Factors

b) Poor Software characteristics

c) Error Prone software delivered.

d) Software that does not perform its intended functions

2. In a risk-based approach the risks identified may be used to :

i. Determine the test technique to be employed

ii. Determine the extent of testing to be carried out

iii. Prioritize testing in an attempt to find critical defects as early as possible.

iv. Determine the cost of the project

a) ii is True; i, iii, iv & v are False

b) i,ii,iii are true and iv is false

c) ii & iii are True; i, iv are False

d) ii, iii & iv are True; i is false

3. Which of the following is the task of a Tester?

i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.

ii. Prepare and acquire Test Data

iii. Implement Tests on all test levels, execute and log the tests.

iv. Create the Test Specifications

a) i, ii, iii is true and iv is false

b) ii,iii,iv is true and i is false

c) i is true and ii,iii,iv are false

d) iii and iv is correct and i and ii are incorrect

4. The Planning phase of a formal review includes the following :

a) Explaining the objectives

b) Selecting the personnel, allocating roles.

c) Follow up

d) Individual Meeting preparations

5. A Person who documents all the issues, problems and open points that were identified during a formal review.

a) Moderator.

b) Scribe

c) Author

d) Manager

6. Who are the persons involved in a Formal Review :

i. Manager

ii. Moderator

iii. Scribe / Recorder

iv. Assistant Manager

a) i,ii,iii,iv are true

b) i,ii,iii are true and iv is false.

c) ii,iii,iv are true and i is false.

d) i,iv are true and ii, iii are false.

7. Which of the following is a Key Characteristics of Walk Through

a) Scenario , Dry Run , Peer Group

b) Pre Meeting Preparations

c) Formal Follow Up Process

d) Includes Metrics

8. What can static analysis NOT find?

a) the use of a variable before it has been defined

b) unreachable (“dead”) code

c) memory leaks

d) array bound violations

9. Incidents would not be raised against:

a) requirements

b) documentation

c) test cases

d) improvements suggested by users

10. A Type of Functional Testing, which investigates the functions relating to the detection of threats, such as virus from malicious outsiders.

a) Security Testing

b) Recovery Testing

c) Performance Testing

d) Functionality Testing

11. Which of the following is not a major task of Exit criteria?

a) Checking test logs against the exit criteria specified in test planning.

b) Logging the outcome of test execution.

c) Assessing if more tests are needed.

d) Writing a test summary report for stakeholders.

12. Testing wherein we subject the target of the test, to varying workloads to measure and evaluate the performance behaviors and ability of the target and of the test to continue to function properly under these different workloads.

a) Load Testing

b) Integration Testing

c) System Testing

d) Usability Testing

13. Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is :

a) System Level Testing

b) Integration Level Testing

c) Unit Level Testing

d) Component Testing

14. Static analysis is best described as:

a) The analysis of batch programs.

b) The reviewing of test plans.

c) The analysis of program code.

d) The use of black box testing.

15. One of the fields on a form contains a text box which accepts alphanumeric values. Identify the Valid Equivalence class

a) BOOK

b) Book

c) Boo01k

d) book

16. Reviewing the test Basis is a part of which phase

a) Test Analysis and Design

b) Test Implementation and execution

c) Test Closure Activities

d) Evaluating exit criteria and reporting

17. Reporting Discrepancies as incidents is a part of which phase :

a) Test Analysis and Design

b) Test Implementation and execution

c) Test Closure Activities

d) Evaluating exit criteria and reporting

18. Which of the following items would not come under Configuration Management?

a) operating systems

b) test documentation

c) live data

d) user requirement document

19. Handover of Testware is a part of which Phase

a) Test Analysis and Design

b) Test Planning and control

c) Test Closure Activities

d) Evaluating exit criteria and reporting

20. The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. When the temperature is more than 21. Identify the Equivalence values which belong to the same class.

a) 12,16,22

b) 24,27,17

c) 22,23,24

d) 14,15,19

Answer

1 a 2 b 3 b 4 b 5 b 6 b 7 a 8 c 9 d 10 a

11 b 12 a 13 b 14 c 15 c 16 a 17 b 18 c 19 c 20 c